Merit Network Downtime, Outages and other Events
Date Prev | Date Next |
Date Index |
Thread Index |
Author Index |
Historical
TT60397: LEVEL3 circuit maintenance on 10/12/07 **UPDATE**
- From: Network Operator
- Date: Fri Oct 12 11:09:11 2007
---------------------------------------------------------------------
MERIT NETWORK, INC. - NETWORK OPERATIONS CENTER - INFORM MESSAGE
SUBJECT: MAINTENANCE - LEVEL3 Circuit
SCOPE: Circuit between Chicago, IL (EQUINIX-GIGSW1)
and Chicago, IL (NW-CHI-GIGSW1)
STATUS: This maintenance was not completed at the expected time of
06:30 on 10/12/2007 and convergence issues are still
present in the Merit network. This condition is
especially pronounced in sites that are directly connected
through Merit's ethernet including the Metro Detroit
Fiber Ring, Lansing Fiber Ring, and the Grand Rapids Fiber
Ring.
MAINTENANCE WINDOW START: Friday, 12 October 2007, 06:00 EDT
MAINTENANCE WINDOW END: ongoing
COMMENTS: Merit technicians are on site at the problem
location and working towards resolution.
---------------------------------------------------------------------
-eaw
---------------------------------------------------------------------
UMnet Network Operation Center Merit
---------------------------------------------------------------------
University of Michigan Merit Network, Inc.
------------------------- --------------------------------
trouble@umich.edu trouble@merit.edu
www.itd.umich.edu/outages www.merit.edu/mail.archives
---------------------------------------------------------------------
|