North American Network Operators Group
Date Prev | Date Next |
Date Index |
Thread Index |
Author Index |
Historical
Re: dry pair
- From: David Meyer
- Date: Fri Aug 29 12:40:11 2003
>> Does anyone know to go about getting Qwest or a CLEC to patch through a dry
>> pair between two buildings connected to the same CO?
>>
>> When I called to order one, no one knew what I was talking about.
Try ordering a LADS circuit (they come in 2 or 4 pair).
Dave
|