North American Network Operators Group
Date Prev | Date Next |
Date Index |
Thread Index |
Author Index |
Historical
Re: BBN (GTE) Suffers another major power problem.
- From: Jonah Yokubaitis
- Date: Fri Aug 08 23:18:04 1997
On Fri, 8 Aug 1997, Matthew F. Ringel wrote:
|Um, actually, it was out longer than that. The power was out from 1730
|until roughly 2245, which was when the last of the Cambridge area outside of
|MIT got power back. MIT got power back at around ~2345
So BBN couldn't last 5:15minutes?? What were you using for power
backup? Some lousy AC UPS systems with 55minute runtime?
Jonah
|